2010-09-17 The rate on onyx

Company   Stejshns Kezinous at construction of first resort Red Fate of the Casino, the Resort and Spa (that   nearby from Las Vegas)   above design reflected not for long. The decision that it is necessary to unite   two components was accepted: the present and features of classical architecture   of 60th years XX of a century.

For this   purpose the studio of architecture and design Fridmutter Group had been collected set both local, and import, materials.

 In registration Red of Fate onyx was used only. A background of   buffet, a frame of a counter of the cashier, a mosaic on a show-window with   meal – all decored green onyx.

The   stake-house, background of a bar are issued by onyx volcano red color. A chalcedonic Bar   (namely lighting devices, a table-top of a bar rack, a background) отдекорирован mainly honey onyx.

 At registration Red of Fate used nearby 500m2 onyx.

This stone   of ancient Jerusalem   shades has been used both in lobbies, and in front of lifts, and as a floor in   Grandee of Cafe. For floor Red Fate of the Casino designers used red-brown sandstone with natural   grooves. 

 Resort Red Fate of the Casino, the Resort and Spa is near   to mountain Red Fate.

For this   reason the command of designers at manufacturing columns has decided to use   local sandstone. Now a resort – organic addition of surrounding   district.

© «HARIS»
Разработка сайтов в Донецке и Донецкой области

86108, Ukraine, Makiyivka, str. Sverdlova, 52

+38(0623) 22-01-58

Ukraine, Kiev, str. Shchorsa 15, block 2, office 1

+38(044) 451-84-24
+38(067) 238-69-45

Ukraine, Mariupol

+38(095) 324-10-03
+38(098) 110-99-54